成人片在线观看免费人A片_午夜福利精品亚洲不卡_亚洲日韩亚洲另类激情文学一_欧美牲交视频免费观看K8经典_男吃奶摸下刺激A片免费_国产成人三级在线视频网站观看_无码日韩精品一区二区三区免费_中文字幕无码专区人妻系列_国产精品扒开腿做爽爽爽a片唱戏_波多野结衣在线中文字幕s级

2024-05-27

Tilenga EPSCC project in Uganda

Suhigo's equipment: rotated pipelayer, trencher, conveyor pulley, etc

 

Suhigo provides pipeline construction equipment such as rotated pipelayer, trencher and conveyor pulley for the Tilenga EPSCC project in Uganda, which is the main oil-producing block in the development of Lake Albert oil and gas field in Uganda. The southern inter-well pipeline started construction this time is 98.4 km long. It includes cluster well sites and inter-well pipelines, water intake pipelines, lake water intake facilities, and Nile directional drilling. After the completion of the project, it will help Uganda become an important crude oil producer in East Africa and is of great significance to promoting Uganda's oil exports and international energy cooperation.